Move the old system while it runs

Agents read every file of the old code and draw the map. Engineers move it across one part at a time, and your team keeps working on it until the day each part is no longer needed.

The system
nobody wants to touch

Six stages,
a decision after each

We adapt it to your team, your tools and the way you already work.

  1. Before anything changes

    Map

    2 weeks · read⁠-⁠only

    What each part does, touches and risks.

  2. Pin down

    Before anything moves

    Tests that record what it does today, odd parts included.

  3. Each part, in turn

    Move one part

    Usually 3⁠–⁠8 weeks

    The least risky part first, rebuilt in your repository.

  4. Run both

    On real work

    Every difference is explained, then fixed or accepted.

  5. Switch

    A way back until you sign off

    Traffic moves over, and the old part stays ready.

  6. At the end

    Retire

    After a quiet month

    Archived. Nothing is deleted without your signature.

Start with the map

Every move starts with a two⁠-⁠week map, priced like a pilot at $2,400 fixed. You get a written account of what the system does, what it depends on, where the risk is and the order we’d move it in, with a price for each part. It’s yours whether or not we go further, and it’s written so your own engineers could work from it. Each part after that is a fixed-price build, from $15,000, usually 3⁠–⁠8 weeks. A whole system typically moves in 3⁠–⁠9 months, with working software switched over all along the way.

The map
2 weeks, $2,400 fixed
Each part
From $15,000, usually 3⁠–⁠8 weeks
Whole system
Typically 3⁠–⁠9 months
Afterwards
Run and support from $600 a month

Before you move it

We don’t have the original developers. Is that a problem?

That’s the usual case. The map is built from the code and the running system, not from anyone’s memory. If someone on your team knows the odd corners, an hour with them saves us a day.

Can an agent really read code this old and this messy?

It reads it faster than a person and misses less on a first pass, which is why we use one. It also gets things wrong with confidence. So an engineer checks the map against the running system before you see it.

Will our users notice the move?

They should notice that things got faster and stopped breaking. They shouldn’t notice the switch itself. Where a screen has to change, we show it to a few users first.

What if the map says not to move it?

Then we’ll say so. Sometimes the right answer is to put tests around the old system, make it safer where it stands and leave the code alone. We can look after it for you.

Do you work with teams outside Vietnam?

Yes, in the US, the UK, Australia, Singapore and Vietnam. Prices are in US dollars, or in đồng in Vietnam. What a developer costs where you are.

Our code and comments are in Vietnamese. Can you work with that?

Yes. We read and write both languages, and the map comes in whichever one your team prefers.

Get a fixed price in writing

Tell us the job. Within three working days, a two⁠-⁠page scope with one price on it. You owe nothing for it.

One fixed price per scope.