Technical debt is the extra work each change costs because of earlier shortcuts in the code. Some of it is worth taking on, and some is worth leaving alone.

By the duyan team · Updated · 3 min read

Old systems

In short

  • Technical debt is the extra effort each change costs because of earlier shortcuts.
  • You pay the interest only when you change that part of the code.
  • Pay it down where the code changes often, a little with each change.
  • Leave messy code alone if nobody needs to change it.

What the term means

Technical debt is the extra work each change costs because of shortcuts taken earlier. The shortcut saved time once, and every later change in that area pays a little for it.

Ward Cunningham coined the comparison in 1992. He likened shipping quick first-draft code to borrowing money, and the time spent working around it to interest.

How it works in practice

Martin Fowler gives a simple example. A feature that would take four days in tidy code takes six in messy code.

The extra two days are the interest. Cleaning up the mess might take five days, which Fowler calls paying off the principal.

For one feature, that doesn't pay. If several similar features are coming, it does, since each then takes four days instead of six.

The comparison has one limit. Financial debt grows every month, but technical debt costs you only when you work in that code.

Where it comes from

Fowler sorts debt by two questions: did the team know, and was it a sensible choice?

  • Chosen and sensible. A team ships a simpler design to meet a launch date, and plans to tidy it later.
  • Chosen and careless. A team skips good design because it thinks there's no time. That usually costs more within weeks.
  • Unknown and careless. A team doesn't know good practice, and doesn't see the mess it's making.
  • Unknown and sensible. A good team learns the better design only after building the system. Fowler calls this kind inevitable.

When to pay it down

Pay it down where the code changes often. That's where the interest adds up fastest.

Pay a little with each change, instead of saving it for one big clean⁠-⁠up. Fowler recommends this because nobody can measure the payoff of a large clean⁠-⁠up in advance.

Pay before a big piece of work in the same area. A new feature built on a tidy base costs less, and breaks less.

Leave it where nobody changes the code. Messy code that works and sits still costs you nothing until you touch it.

What it means for a buyer

You rarely see the debt itself. You see estimates that keep growing, and bugs that appear after each release.

Ask your builder to name the shortcuts they take on purpose, and to log them. Debt that's written down can be planned for and paid at a time you choose.

Common mix⁠-⁠ups

  • Debt and bugs. A bug is the system doing something wrong. Debt is code that works but is slow and risky to change.
  • Debt and old technology. An old framework isn't debt by itself. It becomes a risk when it stops getting security fixes.
  • Debt and legacy. Enough debt, left alone long enough, is one way a system becomes legacy.

What to ask or check

  • Which parts of the system are slowest to change, and why?
  • Which shortcuts were taken on purpose, and is there a list?
  • Is a little clean⁠-⁠up part of each change, or saved for "later"?
  • Before a large feature, does the estimate include tidying that area first?

Start with the map

We map what the old code does, then move it one part at a time while it keeps running.

Sources

  1. Ward Cunningham, "The WyCash Portfolio Management System", OOPSLA '92 experience report, 1992, c2.com (accessed 5 November 2026)
  2. Martin Fowler, "Technical Debt", martinfowler.com, 21 May 2019, martinfowler.com (accessed 5 November 2026)
  3. Martin Fowler, "Technical Debt Quadrant", martinfowler.com, 14 October 2009, martinfowler.com (accessed 5 November 2026)

Tell us the job

Bring a job to build or a role to fill. We reply within one working day, with questions or a next step.