Fixed price, monthly or hourly: what each one rewards

The way you pay shapes how the work gets done. Match it to how well you can describe the job.

By the duyan team · Updated · 3 min read

Costs and buying

In short

  • A fixed price pays for a result, and the builder carries any overrun.
  • A monthly rate pays for people's time, directed by your lead.
  • An hourly rate suits work nobody can size yet, with a cap.
  • Hourly billing gives the seller no reason to work faster, so it needs watching.
  • We price projects fixed and engineers by the month, and never bill a project by the hour.

Our view

Each way of paying rewards a different thing. Pick the one that matches how well you can describe the work.

A job you can write down on 2 pages suits a fixed price. A roadmap that keeps moving suits people by the month.

Work nobody can size yet suits hourly billing, with a cap.

What a fixed price rewards

At a fixed price, the builder is paid for the result. If the work takes longer, the builder pays for the overrun.

US federal buying rules say a firm fixed price puts the most risk on the seller. It also gives the seller the strongest reason to keep costs down.

So a fixed price rewards finishing a defined job well and without waste. It needs a scope that says what the work does and what "done" means.

It has weak points too. The builder adds a margin for risk, so you may pay for problems that never happen.

Anything outside the scope needs a priced change note. A vague scope also invites arguments about what was promised.

What a monthly rate rewards

With a monthly rate, you pay for a person's or a team's time. Your lead directs the work and can change priorities each week.

It rewards steady progress on a product that keeps growing. You get people who learn your systems and stay with them.

The risk of slow progress sits with you, so someone on your side has to lead. You also pay through the quiet weeks.

What an hourly rate rewards

An hourly rate pays for time, so more hours mean a larger invoice. You pay only for what is used, and work can start without a scope.

The same US rules say hourly contracts give the seller no profit reason to work efficiently. So they allow them only when the work can't be sized at the start.

Under those rules, the buyer must watch the work closely. The contract must also carry a price ceiling.

Coding agents make the hour a weaker measure too. With agents, an engineer can finish some tasks in far fewer hours. An hour then says less about what you got.

The three ways compared

The three ways compared
Way of payingYou pay forOverrun risk sits withSuits
Fixed priceA defined resultThe builderA job you can write down
MonthlyFull⁠-⁠time people, directed by youYouA roadmap that keeps moving
HourlyHours workedYouWork nobody can size yet

When hourly is the right choice

Hourly billing fits some work better than either of the others:

  • a short diagnosis of a problem nobody can size yet
  • expert advice in small pieces, such as a few hours of review a month
  • urgent fixes on a system nobody has documented

Even then, set a cap on the hours. Ask for a short written note of what each block of time produced.

A fixed price is the wrong tool when the job can't be described. The builder will either add a large margin or argue over each change.

A monthly rate is wrong for a one⁠-⁠off job with a clear end. You would pay for months of time to get one result.

How we price

We price projects at a fixed price per written scope. A 2⁠-⁠week pilot is $2,400, and builds start at $15,000.

Engineers join your team full⁠-⁠time, from $3,000 a month for mid⁠-⁠level, with a 3⁠-⁠month minimum, one engineer or several. We never bill a project by the hour.

When a job is too unclear to scope, we suggest a pilot. It sizes the unknown part at a fixed price.

What to do

  1. Try to describe the job on 2 pages, with what "done" means.
  2. If you can, ask for a fixed price, with "done" checked by tests.
  3. If you can't, pay for a short fixed-price pilot or a capped diagnosis first.
  4. If the work will keep changing for a year or more, hire people by the month.
  5. If you do pay by the hour, set a cap. Ask what each block of hours produced.

Two ways to work with us

A fixed-price project we build and can run. Or senior engineers in your team full⁠-⁠time, one or several, from $4,200 a month.

Sources

  1. US Federal Acquisition Regulation, 16.202-1 "Firm-fixed-price contracts: Description", acquisition.gov (accessed 5 November 2026)
  2. US Federal Acquisition Regulation, 16.202-2 "Firm-fixed-price contracts: Application", acquisition.gov (accessed 5 November 2026)
  3. US Federal Acquisition Regulation, 16.601 "Time⁠-⁠and⁠-⁠materials contracts", acquisition.gov (accessed 5 November 2026)